-
Work completed Thursday, September 19, 2024
- Design T05032 schedule cover.
- Print the T05032 schedule, a total of 1555 pages in color.
- Prepare T05032 timetable card control table, card control strip, departure plan.
- Sort out the common release forms and archiving of scheduling commands.
- Summarize the weekly summary.
- Follow up the addition of suppliers.
- Study recent documents.
- Replace 20 800 m backup power modules and borrow two 800 m modules from the DCC.
【1】Think thrice every day (think first about what you did well, think twice about what you did badly, think twice about what you gained today and plan for tomorrow):
The recent things have inevitably had an impact on life, the words are less, the smoking is also more, it is not clear whether it is punishment or to really end.
【2】One sentence a day (one hundred words):
Deliberate before you begin, then execute with vigour.
Work completed Wednesday, September 18, 2024:
- Guanchen Depot cooperated with the center level engineering car brake technology competition.
- Preparation of tomorrow’s track inspection vehicle precautions.
- The cooling-off period for submitting the application is 30 days.
- Prepare and submit a summary of the Mid-Autumn Festival passenger transport organization.